Glazing
6.1 Using the provided 4mm glazing packers, pack out the bottom edges of the frame in each corner
6.2 Lift the glass onto the packers and clip the bottom bead into the fixing panel, followed by the top bead, and finally the side beads
6.3 Take care to avoid catching the frame edges during installation
6.4 The beads may require a gentle tap with a rubber mallet to fix them in place, as these are knock-in beads, with the gasket pre-applied (if necessary, you may need to pack the glass in level down the sides to centralise the unit
NOTE: Ensure compliance with BS 6180:2011 Barriers in and about Buildings - Code of Practice.
Fixings will need to be no more than 300mm apart and fixed through both sides of each frame, ensuring that all fixings are countersunk, and flush.