Adjustments
9.1 If adjustment is needed, you will find a toe and heel device in the top of each door
9.2 Open the doors so that you can get access to the toe and heel device at the top of the door. Using a 4mm Allen key, wind the bolt clockwise, causing the side of the door to rise
9.3 Re-close the doors and check that they run parallel and evenly to the top and bottom tracks. If they do not, then repeat as necessary
9.4 Once you have adjusted the doors, make sure that each toe and heel plate is tight to the glass in each door, this will prevent the doors from settling over time
Note: Not applicable for OB-36+ SOHO
10.1 When the lead door is closed, there should be a visible gap of 4mm between itself and the jamb or locking style, adjust as follows if necessary*
10.2 Remove the two centre fixings from one jamb and remove the top fixing from that jamb
10.3 Repack the top of the jamb to give a 4mm gap between the edge of the lead door and jamb - replace the fixing in the top of the jamb
10.4 Remove the bottom fixing from the jamb
10.5 Repack the bottom of the jamb to give a 4mm gap between the edge of the lead door and jamb - replace the fixing in the bottom of the jamb
10.6 Pack and replace the remaining two fixings, keeping the even 4mm gap
*This is temperature dependent. When installing in particularly hot weather, the gap along the slam and rebate may need reducing slightly. In particularly cold weather, this gap may require increasing slightly. This accounts for the minimal potential expansion and contraction with thealuminium profile.